Friday, March 11, 2011

4 tap Kegorator started

After getting my RyePA starter going last night, began my 4 tap kegorator project.  Since the inside of the upright refriderator door has wavy curves in the plastic, cut a big section out, while leaving the bottom door shelf in tact.  The used foamboard glue in the cut out area to insulate the door.  I think I'll use a peice of 1 by 2 on the inside so the shank nut has a stiffer surface to be tightened against so it doesn't wear the foamboard down over time from use.  Hopefully I'll figure how to post pictures here or maybe at my Yahoo website.

1 comment: